Blog category

Field Work

Field work covers what happens on site before and during a toilet partition or locker installation: taking accurate field measurements, checking floors, walls and ceilings, confirming anchoring and blocking, and coordinating delivery with the general contractor. The articles in this category explain how our estimators and installers measure, what to have ready for a site visit, and the mistakes that cause delays, so your restroom, locker room or washroom project is ordered correctly the first time. Browse the guides below, or contact Mavi New York to schedule a field measurement for your project in New York, New Jersey or Connecticut. A good field measurement records the room width and depth, ceiling height, door and pipe locations, wall construction and any obstructions such as sprinklers, vents or columns. Photos and a simple sketch help our estimators prepare shop drawings, confirm that the partitions, lockers or accessories will fit, and quote the supply and installation accurately. Start with the guide below, then send us your measurements, plans or photos and we will review them with you.

Ready to price your project?

Get a free starting price, availability and installation scheduling from our Long Island City team. Limited powder-coated and stainless steel stock; other materials are subject to manufacturer lead time.